LAHORE, PAKISTAN BEYOND DEVELOPMENT+92 311 1145 002

Plan with perspective

Your build. Your budget.

Plan your construction budget with editable rates, a clear area breakdown and the scope behind the estimate.

01

Define your project

Included by default for double storey and above. The 5 marla example allows 271.25 sq ft; adjust this to your drawings. The selected rates apply to the mumty too.

Main floors + mumty, counted once. Plot sizes 5, 10 and 20 marla start at 2,150, 3,500 and approximately 6,150 sq ft respectively, using two main floors including mumty. These are editable planning totals, not universal scheme limits. Editing this total adjusts coverage. Basement is additional.

02

Set planning rates

Each phase starts at PKR 3,000 per sq ft. Complete build combines both rates. Edit the rates to match your specification; selecting a city does not change them automatically.

Coverage and mumty area are planning assumptions; confirm them against the approved drawings. Basement grey work uses a 35% rate uplift. Review the materials and scope below before comparing budgets.

03

Materials & scope

Grey structure. These are planning allowances for the selected scope. Final brands, grades, quantities and specifications must be agreed in the written quotation. The materials below are covered by the square-foot rates, not additional charges.

Materials allowance

Grey structure

  • Cement, sand and crushed aggregate for concrete, masonry and plaster.
  • Reinforcing steel and RCC concrete to the structural design.
  • Bricks or blocks to the agreed specification.
  • Damp-proofing and standard roof waterproofing materials.
  • Concealed plumbing pipes, drainage pipes and electrical conduits.

Included services

  • Setting out, normal excavation and foundation works.
  • RCC columns, beams, roof slabs and staircases.
  • Masonry, plaster, damp-proofing and standard roof waterproofing.
  • Concealed plumbing/drainage and electrical conduit installation.
  • Labour and routine site supervision for the selected scope.
  • Mumty / stairhead structure within the entered area, at the selected square-foot rates.

Excluded from this estimate

  • Finishing works: tiles, paint, wiring/switchgear, sanitary fixtures, doors, windows and joinery.
  • Basement work (not selected).
  • Land purchase, design/consultant fees, soil testing and approval fees.
  • Utility connections, meters, statutory charges and taxes.
  • Demolition, piling, dewatering and abnormal soil or retaining works.
  • Boundary walls, gates, landscaping and external development works.
  • Solar systems, air conditioning, lifts, appliances and loose furniture.
  • Imported/premium upgrades and specialist work outside the agreed specification.

The same area breakdown, rates, materials and scope are included in your downloaded estimate. Quantities and final product selections require the project drawings and bill of quantities.

Your next chapter

Something worth building.
Let’s begin.

Tell us what you have in mind.
We’ll help you shape the next step.

Discuss your project
CallLet’s talk